Dubuque County Courthouse historic Beaux-Arts exterior with GENISYS PoE lighting retrofit
Resources

Dubuque County Courthouse

Weekend-only historic courthouse PoE retrofit - cut energy while preserving 1891 fabric.

Municipalities Case Study

Historic Courthouse Retrofit

Dubuque County needed reliable, fast-installing category cable and GENISYS PoE to cut a $6,000+ monthly electric bill without shutting down court.

“I average more than $6,000 a month for our electric bill, and my goal was to decrease that number significantly.”
- Chris Soeder, Facilities Superintendent, Dubuque County
The Opportunity

Located in northeast Iowa along the Mississippi River, Dubuque County’s courthouse - built in 1891 with Beaux-Arts architecture - is on the National Register of Historic Places. To reduce energy costs in the century-old building, Facilities Superintendent Chris Soeder was investigating improvements that would provide financial savings while preserving the building’s historic nature.

At a local technology conference, Soeder learned that by investing in an intelligent lighting upgrade, the courthouse could experience energy savings of between 15% and 20%. Getting wires from point A to point B is sometimes rather convoluted - walls that are 42 inches thick, runs that go up a floor and back down. And because the courthouse doesn’t close during the week, work could be done on weekends only.

The Solution

Innovative Lighting’s GENISYS lighting system - node-centric design with IntelliDrive supporting up to eight devices - was paired with Belden Small-Diameter 10GXS Category 6A cables and REVConnect connectivity. Power comes from a switch; category cables run to the IntelliDrive; fixtures, controls, and third-party devices connect from there.

Instead of conduit, junction boxes, and 12 AWG wire, the low-voltage install involved removing the existing fixture and 110V wiring, installing the new fixture and IntelliDrive, and running Belden Cat 6A. “It takes about one day for us to hang all the hardware in the ceiling. After that, it’s a matter of plug and play,” says Soeder. IT Superintendent Nathan Gilmore chose Belden because he knows the product line is rock solid - worth doing cable right so cabling can be crossed off the troubleshooting list.

The Impact

Faster installs. Remote monitoring. Confidence to put more systems on the network.

Removing the need for conduit, wire, and junction boxes helped Belden and Dubuque County speed up installation so the courthouse could remain functional during the week. Now that lighting is managed over the network, Gilmore and Soeder have freed up time to focus on other tasks. In addition to lower energy bills, the system supports county sustainability goals with 100% recyclable fixtures and no metallic infrastructure. Success here gave the county confidence to plan the same solution for its new roads and maintenance facility - and to consider moving other traditional mechanical systems to the network.

When you consider manpower, it’s definitely easier and faster. You don’t need a third person to manage software and operation of the system, which, to me, is worth its weight in gold. We can either carry a laptop with us or log into the system from a computer and see what’s going on. It makes it so much easier to monitor and maintain the system, as well as watch how much electricity we’re using.
Chris Soeder Facilities Superintendent, Dubuque County